The ZOOMLION K56X-6RZ truck-mounted concrete pump integrates advanced technology and superior performance, serving as a reliable assistant in the concrete construction field. With its reliable quality and high-efficiency operation, it injects strong momentum into various engineering projects.
- High-Efficiency Pumping: Equipped with an advanced pumping system, it delivers a large output volume, enabling rapid concrete placement and significantly shortening the construction cycle.
- Flexible Boom: With a 56m vertical boom and 51m horizontal boom, it extends flexibly to reach complex construction areas easily, offering a wide coverage range.
- High Stability: Optimized overall design ensures stable and reliable operation, reducing shaking and guaranteeing construction safety and quality.
Parameter |
Details |
Model |
ZOOMLION K56X-6RZ |
Production Date |
April 2025 |
Vertical Boom Height |
56m |
Horizontal Boom Height |
51m |
Theoretical Concrete Output |
180m³/h |
Concrete Pumping Pressure |
11.3MPa |
Vehicle Kerb Mass |
32,700kg |
Widely used in large infrastructure projects requiring concrete placement, such as high-rise buildings, bridge construction, tunnel engineering, and water conservancy facilities.
Customized solutions are available for boom configuration, pumping capacity adjustment, and overall vehicle dimensions to meet specific construction needs and diverse application scenarios.
Q1: How to perform daily maintenance on the equipment?
A1: Regularly inspect for loose bolts at boom connection points; monitor the hydraulic oil level and cleanliness of the pumping system, and replace hydraulic oil as specified; check wear on vulnerable parts (e.g., pistons, delivery pipes) and replace them as needed; keep the water tank clean and periodically remove impurities; lubricate all lubrication points according to the maintenance manual.
Q2: How to report a fault with the equipment?
A2: Contact your local ZOOMLION after-sales service center directly, providing the equipment serial number and fault description. Alternatively, call the ZOOMLION official customer service hotline to report the issue in detail, and professional maintenance personnel will be dispatched for on-site repair.
Q3: What are the requirements for the construction site?
A3: The construction site must be flat and solid enough to bear the equipment’s self-weight and operational loads. Sufficient space must be reserved for smooth boom deployment and vehicle parking/movement. The site should be free of obstacles like high-voltage lines to ensure safe operation.
Q4: Why is the equipment’s fuel consumption high?
A4: Possible causes include engine faults (e.g., poor fuel injector atomization), leaks in the pumping system leading to extra energy loss, frequent or improper boom movements increasing unnecessary energy consumption, and poor site road conditions with frequent stops/starts. Contact professionals to inspect the engine and pumping system, and optimize operation procedures to improve efficiency.
Q5: What are the vulnerable parts of the equipment? What is the approximate replacement cycle?
A5: Common vulnerable parts include concrete delivery pipes, pistons, S-valves, spectacle plates, and cutting rings. Replacement cycles vary by construction conditions and concrete output volume:
- Pistons: Inspect/replace after pumping 30,000–50,000 m³ of concrete.
- Delivery pipes: Replace after pumping 80,000–100,000 m³ of concrete.
- Spectacle plates/cutting rings: Monitor wear and replace after pumping 50,000–80,000 m³ of concrete.
Actual cycles should be determined based on specific usage.